How much does a bathroom remodel cost in Chicago's western suburbs?
Most full bathroom remodels by Luxe Development land in the mid five figures, with hall baths at the lower end of the band and primary spa baths at the top. Room size, plumbing changes, and your tile and stone selections set where you fall. You approve a fixed, itemized budget before construction begins, so the number never drifts. Our bathroom remodeling contractors page covers what's included in a full Luxe bath.
Why does a primary bathroom remodel cost more than a hall bath?
Size and scope. A primary bath has more floor and wall area to tile, more fixtures, and usually a walk-in shower, a double vanity, and a freestanding tub. Layout changes add plumbing and structural work a hall bath rarely needs. More material, more labor, more trades on site, and we itemize every line of it before you approve.
How much does a tub-to-walk-in-shower conversion add to the cost?
The conversion is usually one of the larger line items in a full bathroom remodel, and it's priced line by line inside your fixed budget. The drivers are a larger drain, new waterproofing, added tile area, and the glass enclosure. A curbless entry costs more than a curbed one because the floor gets recessed and re-sloped. We price both options so you can decide with real numbers.
Are heated floors worth adding to a bathroom remodel?
For most of our clients, yes. Heated tile floors are one of the most-loved upgrades we install, and adding them during a remodel costs far less than tearing up a finished floor later. The system goes in as a defined line on your itemized budget before tile is set. If it doesn't fit your budget, we tell you plainly and the rest of the project doesn't change.
How does Luxe keep the budget from changing mid-project?
You approve a fixed, itemized budget before construction begins, and that number is the number we build. Every slab, tile, and fixture is selected and priced during design, so there are no low allowances waiting to become change orders. Architect, engineer, and builder work as one accountable team, so nothing gets re-quoted in a hand-off. We've built this way from the start, as a licensed general contractor and fully insured.